Specification; Dimensions And Connections; Minimum Clearances To Hard Surfaces - Stiebel Eltron CK 150-1 Trend Manuel D'utilisation Et Installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION
14. Specification

14.1 Dimensions and connections

(27.4 cm)
10
CK 150-1 Trend / CK 200-2 Trend
g01
Air intake
g02
Air discharge
g03
Strain relief clamp / cable entry
8
| CK 150-1 / 200-2 Trend
(13.1 cm)
5
g01
g02
8 (20.2 cm)
g03

14.2 Minimum clearances to hard surfaces

ANY HARD SURFACE
minimum
4 (10 cm)
minimum 4 (10 cm) recommended 6-8 (15-20 cm)
The images above show minimum allowed clearances be-
tween the installed heater and any hard surfaces.
We recommend installing the heater 6-8˝ (15-20 cm) off the
floor.
CAUTION: Injury
!
Maintain the minimum clearances.
minimum 12
(30.5 cm)
minimum
4 (10 cm)
FLOOR
minimum
20 (50 cm)
FLOOR
www.stiebel-eltron-usa.com

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ck 200-2 trend236304236305

Table des Matières