Hydraulic installation:
Please respect the general installation instructions for the
preparation of water installations as well as the general
hygiene requirements.
and safety instructions prior to the installation.
the DVGW W 543 requirements.
Please adhere to all dimensions as well as bending radius in
the assembly of the flexible tubes and connection sets.
®
compact 2 - 6 device line is to be installed
and operated vertically.
be installed in the permeate line between the RO unit and the
consumer, if depending on the application a short-term peak
flow is required.
Connection to the water pipe:
(without any tension) to maintain a safe operation.
waterproof.
to the on-side connection of the drain pipe (with a slope of 1%)
and fasten it. The "flexible" hoses must not have any bends or
cross-sectional constrictions. Observe during the installation that
the concentrate- and permeate hoses were correctly connected.
Notes for initial operation:
(230V, 50Hz). The wall socket has to be earthed.
water hardness can vary in different areas.
4
Fig. 3: Installation scheme / example
"free flow" condition
external pre-filter.
BWT Protector Mini C/R 1/2" ;
BWT accessories
2
Generally, we recommend the operation with softened feed
water to achieve an extending of the life and reliability of the
RO membranes.
All hoses have been connected and are watertight.
When installing the optional "high-efficiency" WCF -
Kit, the enclosed operation manual must be observed!
The functions of the control unit and software configuration
are described in Part 3.1 - 3.8.
mode to set at approx. 8.1bar!
Note: Discard the first produced permeate during the first
10 minutes after any new installation/first commissioning or
at any membrane replacement.
Note: Please run the RO unit a few days to reach the
full performance (WCF and permeate quality).
Note: A drop of temperature by 1°C will reduce the
permeate output of the membranes by approx. 3.0%.
Possible installation layout:
1 BWT PERMAQ
compact 2 - 6 reverse osmosis
®
2 External pre-filter (not included in the delivery)
3 Permeate outlet ready for the connection to the consumer/tank
4 Stop valve for feed water and permeate hose
5 Mains plug, cable length 1.8m
6 Concentrate outlet
7 Optionally: External contacts (INPUT), start/stop
8 Optionally: External contacts (OUTPUT), alarm output
5
7
8
Part 5.3.
1
6
3
EN
33