Electrodes; Pipe Leak Tested - Baxi Luna HT 1.330 Notice D'installation Et D'entretien

Masquer les pouces Voir aussi pour Luna HT 1.330:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Set the selector switch to 0, isolate the electricity supply and close the boiler gas service cock (see Fig. 2). Allow the boiler
to cool.
1 Heating circuit
Close the central heating flow and return valves (see Fig. 2).
Connect a suitable pipe to the drain point and route it to a suitable container. Open the drain tap.
2 Hot water circuit
Close the mains water inlet valve (see Fig. 2). Open any hot tap below the level of the boiler to allow as much draining
as possible.
Note: Some water will remain in the components and care must be taken when removing them.
Fig. 38
Once all the inspections have been performed, the piping must be leak tested. If the leak test requirement is a higher test
pressure than the maximum inlet pressure, you must isolate the Boiler from the gas line. In order to do this, you must shut
the gas off using factory and field-installed gas cocks. This will pre-vent high pressure. Failure to do so may damage the
gas valve. In the event the gas valve is exposed to a pressure greater than 0.85 psi, 23.5" water column (58.5 mbar), the
gas valve must be replaced. Never use an open flame (match, lighter, etc.) to check gas connections.
The system may have residual substances that could affect water chemistry. After the system has been filled and leak
tested, verify water pH and chlorine concentrations are acceptable.
INSTALLATION AND SERVICING INSTRUCTIONS
15.1 DRAINING THE BOILER

15.2 ELECTRODES

15.3 PIPE LEAK TESTED

(REFER TO FIG. 1)
50
7109739.01 - en

Publicité

Chapitres

Table des Matières
loading

Table des Matières