Setting / Adjustment; Installation / Transport - Mafell ERIKA 85 Ec Traduction De La Notice D'emploi Originale

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 32
sufficiently
ventilated
extraction hose 5 (Fig. 5 - page 3) must therefore
be used as connection of the upper saw guard to
the extraction connection 4. The air velocity must
be at least 20 m/s (65.6 ft/sec.).
Instructions on service and maintenance:
- Before beginning maintenance and repair work,
pull the connecting cable out of the socket outlet.
- Only allow an electrician to carry out work on the
electrical parts of the machine.
- Damaged cables or plugs must be immediately
replaced.
- The MAFELL customer service must replace the
tabletop, if the table slit has been sawed
exceedingly.
- Regularly cleaning the machine, especially the
table and the guides of the mobile parts,
constitutes an important safety factor. The power
plug must be pulled before beginning this work.
- Only original MAFELL spare parts and accessories
may be used. Otherwise, the manufacturer will not
accept any warranty claims and cannot be held
liable.
4

Setting / Adjustment

4.1 Installation / transport

The machine is delivered in a transportation box.
Check the machine for possible transport damages.
Damage to the packing material may already be
indicative of improper transport. Immediately notify
your machine dealer of transport damages.
The following parts are packed loosely and must be
installed or attached to the machine before start-up:
- Upper saw guard
- Extraction hose
- Branch pipe (Connection of upper and lower
extraction connection)
- Multi-function stop
- Slide block
Proceed as follows for assembly:
Upper saw guard
Unfasten the wing screw 2 (Fig. 2 - page 3) by
about 5 rotations. Press this wing screw and
room.
The
provided
-24-
push the saw guard 1 horizontally onto the kerf
guide 3. Make sure that the guide piece of the
wing bolt is firmly engaged in the drilling of the
kerf guide when you release the wing bolt. Align
the saw guard in the required position and
tighten the wing bolt 2 again.
Extraction hose and branch pipe
First, attach the branch pipe 4 (Fig. 5 - page 3)
to the extraction connection on the lower saw
guard. Connect the extraction connection on the
upper saw guard to the extraction hose 5. Push
this onto the appropriate connection of the
branch pipe.
Multi-function stop
The assembly of the multi-function stop is
described
in
instructions.
Slide block / Push handle
The supplied slide block 6 (Fig. 5 - page 3) can
be stored both on the right as well as on the left
longitudinal side of the machine in the intended
fixture between the moulded lateral transport
handles 7.
For storing the slide block handle (special
accessory), use the drillings front right or rear
left on the longitudinal sides of the machine, in
which you can insert the slide block handle.
According to requirements, you can attach a
slide block to the slide block handle. For this
purpose, attach the handle to the slide block
and press both tips into the wood. Then apply
the wing bolt and screw it in.
The moulded transport handles 7 on both lateral
sides can be used by two persons to transport the
machine.
The height staggered arrangement of the handles on
the longitudinal and transverse sides enables easy
transport of the machine over stairs, whereby the saw
can be held by one person from above and by the
second person from the bottom and therefore
transported horizontally.
Both feet 9 and 10 (Fig. 6 - page 3) of the underframe
can be folded for easier transport. Handle recesses
are arranged on the front and rear side directly below
the tabletop to enable transport by one person.
the
enclosed
assembly

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

971601971620971621971625

Table des Matières