Commissioning

Water and hydraulic system

Commissioning of the boiler should be
carried out by authorized personnel
only. Failure to respect this condition
makes the guarantee void. A protocol
of the commissioning should be filled
out (see end of this chapter for example
of commissioning protocol).
Boiler output
[kW]
50 - 200
200 - 600
Concentrate
Ca(HCO
)
3
2
3
mol/m
ºdH
ºf
≤0.5
≤2.8
≤5
1.0
5.6
10
1.5
8.4
15
2.0
11.2
20
2.5
14.0
25
≥3.0
≥16.8
≥30
2
This chapter explains the commissio-
ning of the boiler with the standard boi-
ler controller. When an additional sys-
tem controller is installed, please refer
to its manual for commissioning the
controller.
Max. sum of alkaline earths
3
[mol/m
]
2.0
1.5
Capacity of installation Q (kW)
150
200
250
300
Maximum water (re)fill volume V
-
-
-
-
-
-
3
4
5
3
4
5
1.9
2.5
3.1
3.8
1.6
2.1
2.6
3.1
Water pressure
Open the valves to the system. Check
the water pressure in the system. If the
water pressure is too low (see table
below), increase the pressure up to at
least the minimum required water
pressure in the table.
Minimum operating
pressure
1
[bar]
> 1.5
Max. total hardness
[ºdH]
[ºf]
11.2
20
8.4
15
400
500
600
3
[m
]
max
-
-
-
-
-
-
-
-
6
8
10
12
6
6.3
7.8
9.4
5.0
6.3
7.5
4.2
5.2
6.3
Flow tempe-
rature
[ºC]
90
Water quality
The system should be filled with water
with a PH value between 8,0 and 9,5.
The chloride value of the water should
not exceed 50 mg/l. Entry of oxygene
by diffusion should be prevented at all
times. Damage to the heat exchanger
because of oxygene diffusion will not
be taken under warranty.
In installations with higher water volu-
mes, it's necessary to respect the maxi-
mum filling and additional volumes with
corresponding hardness values as sta-
ted in the german VDI2035 standard. In
the table you can find the nominal va-
lues for filling and additional water for
the THISION L according to the the
VDI2035.
The table at the left gives an indication
of the relation between the water quali-
ty and the maximum water filling volu-
me during the lifetime of the boiler.
Consult the original text of the VDI2035
for more detailed information.
Filling can eventually be done via the
(optional) fill and drain valve (2) on the
return connection (1) of the boiler.
Hydraulic system
Check if the boiler is hydraulically con-
nected to the system in such way, that
water flow can be secured at all times
during burner operation. The water flow
is supervised by ∆T-protection in the
boiler and a lack of flow will lead to a
direct burner stop and lockout of the
boiler.