Installation Of The Unit; Suspension Cdp 35, 45 & 65; Condensate Outlet - Dantherm CDP 35 Manuel D'entretien

Masquer les pouces Voir aussi pour CDP 35:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

2. Installation of the unit

2.1 Suspension CDP 35, 45 & 65
The wall suspension bar supplied with the unit is fixed to the wall and the dehumidifier is hung up on it. It is
important to mount the unit in a horizontal position to secure correct outflow of the condensate water.
To make sure that the room air passes unimpededly through the dehumidifier, air inlet and air outlet openings must
be free.
It is important that the dehumidifier is not installed near a source of heat as for example a radiator and doors and
windows must be kept closed when the dehumidifier is in function.
NOTE! Dantherm recommends a minimum
distance between dehumidifier and ceiling
and dehumidifier and floor of 225 mm.
*The dimensions indicate the placing of
the wall suspension bar.

2.2 Condensate outlet

The condensate outlet is located at the bottom of the dehumidifier. The unit has a drain spigot intended for
connection of a ½'' flexible or fixed water connection. If water drain through the wall is chosen, a suitable hole is
made in the wall and the condensate hose is led out through this hole, before suspending the dehumidifier on the
wall suspension bar.
It is important that the hose from the dehumidifier to the drainage has a fall of at least 2% to make sure that the
water runs away from the condensate tray.
As an alternative a condensate pump can be fitted at the water outlet to pump the water to a drain.
The placing of the condensate outlet is shown on the drawing below – the unit is seen from above.
*
*
10

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Cdp 45Cdp 65

Table des Matières