Installation; Boiler Fixing; Fuel Supply - Riello RG4D TL Manuel D'entretien

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

3.

INSTALLATION

3.1 BOILER FIXING

Put on the flange (1) the screw and two nuts, (see fig. 3).
Widen, if necessary, the insulating gasket holes (4), (see fig. 4).
Fix the flange (1) to the boiler door (3) using screws (5) and (if necessary) the nuts (2) interposing the
insulating gasket (4), (see fig. 2).
After installation ensure that burner is lightly inclined as in fig. 5.
Fig. 2
Fig. 3

3.2 FUEL SUPPLY

The burner is designed to allow entry of the oil supply pipes on either side.
Depending on the oil supply pipes position (to the right or to the left hand side of the burner) the fixing plate
(1) and cable clamp (2) should be reversed, (see fig. 6).
1
1917
Fig. 6
2
2
3
GB
D5012
Fig. 4
S7071
D5025
Fig. 5
1
D5345

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

20052624

Table des Matières