Télécharger Imprimer la page

Dielectric And Ground Test Label - Opex Omation 210 Série Manuel D'utilisation

Publicité

Les langues disponibles

Les langues disponibles

2.3.5. Dielectric and ground test label

Rear of the machine (Figure 2-5).
Location:
To inform personnel that the ground points in the machine are well
Purpose:
connected between each other and it has passed the ground bond test.
Figure 2-5: Dielectric and Ground Test label P24838-01
Safety
25
Omation Series 210™ Envelopener® Operator Manual
OPEX Corporation

Publicité

loading

Ce manuel est également adapté pour:

Omation dl 210Omation dl 410