DC-Kit6
7.2
Installing components
➤ Install the ECL-103 charging current distributor.
➤ Install the SinePower MSI2324T inverter.
➤ Install the MCR-9 remote control.
D
DANGER! Electrocution!
Only connect the battery once you have the completed all the
installation work and you are certain it has been done properly.
7.3
Connecting the B2600 Dometic roof air conditioner
➤ Remove the outlet panel of the roof air conditioner, if necessary also remove the
upper cover ( B2600) (fig. 2, page 3).
➤ Join on/off cable for B2600 to the plug connector on the circuit board (fig. 3,
page 3).
I
NOTE
Guide the on/off cable carefully past the fan.
➤ Join the universal connection cable to the on/off cable of the B2600 .
➤ Connect the universal connection cable to connections I2 and I5 of the charging
currentdistributor ( ECL-103) (fig. 1, page 3).
➤ Attach the outlet panel of the roof air conditioner ( B2600) (fig. 2, page 3).
➤ Run the connection cable of remote control MCR-9 to the inverter and connect
( MSI2324T).
7.4
Connecting the B3200 Dometic roof air conditioner
➤ Connect the D+-output on the light system using a 1 mm² cable to connection I2
of the changing current distributor ( ECL-103) (fig. 1, page 3).
➤ Connect the R+-output of the ECL-103 to the control cable connection on the
MCR-9 remote control (fig. 6 1, page 5).
EN
Installing and connecting the DC Kit
13