Table des Matières

Publicité

4 I
NSTALLATION
This section deals with provisions for the installation of equipment.
Installation and initial start up must be performed by an electrician or professional installer to prevailing standards
(in the case of pleasure vessels, comply with international standard ISO10133).
a.
Remove the front cover of the battery charger.
b.
Open the pre-cut cable passage using flat pliers.
c.
Adjust and insert the grommet.
d.
Install the front cover and route the cable through the passage provided for this purpose.
16300DEB-CRISTEC.docx
11

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Seel016301

Table des Matières