Télécharger Imprimer la page

Installation; Isolator Positioning - Cristec RCE/100-1E-2IG Manuel Utilisateur

Masquer les pouces Voir aussi pour RCE/100-1E-2IG:

Publicité

Les langues disponibles

Les langues disponibles

Table of references according to the various options
Item
RCE/100-1E-2IG
RCE/100-1E-3IG
RCE/100-2E-3
RCE/150-1E-2IG
RCE/150-1E-3IG
RCE/180-1E-2IG
RCE/180-1E-3IG
RCE/200-1E-3IG
4 I
NSTALLATION
4.1

ISOLATOR POSITIONING

Install the RCE in a dry place free from flammable substances.
Position the isolator on a flat surface.
Install the isolator so that the heatsinks (small fins) are vertical.
A clearance zone of around 100mm around the splitter is recommended for ventilation.
Do no put anything against, or on the top of RCE.
Do not install the isolator on the engine.
It is preferable to install the RCE as close as possible to the battery banks (see section of the cables paragraph).
F
4.2
IXING AND TIGHTENING THE ISOLATOR
The isolator should be fixed correctly with a system of screws, washers, nuts and lock nuts to prevent falls due to
vibrations.
Tables of tightening according to the sizes of the threaded rods
Max Current
Item
RCE/100
RCE/150
RCE/180
RCE/200
MAX Current
100A
150A
180A
200A
ø
Threaded
(A)
rod input (Iso)
100
M6
150
M8
180
M8
200
M10
Number of
Number of
inputs
1
2
1
ø
Threaded rod
output (Iso)
ø
M6
M6
M8
M8
IG
Outputs
Terminal
2
YES
3
NO
2
3
2
OUI
3
Tightening (N.m)
Threaded rod(Iso)
M6
M8
M10
3,83
7,26
14,62
22

Publicité

loading