Fortress Building Products PURE VIEW Instructions D'installation page 45

Masquer les pouces Voir aussi pour PURE VIEW:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Fig. 1
Cut Line
Fig. 3
Step 3:
Install Stair Post Splice (OTP)
1. Test fit the Stair Line Post Splice by locating its position
above the 2" [51mm] post and mark the edge locations.
Measure the length of the mark to the next post and add
.625" [16mm] to the number. This will be your ATR length.
2. Cut the ATR as mentioned in the previous step.
3. Attach the ATRs to the panels first.
4. Snap the Splice over the ATRs. Once in position, use the
supplied self drilling screws (2) to attached the splice to the
post.
5. Use a broom or air compressor to remove debris from
railing and deck surface.
Note:
• ATRs must be at least 1.5" [38mm] apart but cannot
exceed 2.75" [70mm].
• It is recommended that the ATR and post splice are test
fitted together above the rail before installing.
PURE VIEW: Al
Cut Line
HOME GLASS BALUSTER INSTALLATION
13
Fig. 2
Fig. 4
ATR Should Not Go Past This
Point When Test Fitting
45

Publicité

Table des Matières
loading

Table des Matières