Fortress Building Products PURE VIEW Instructions D'installation page 28

Masquer les pouces Voir aussi pour PURE VIEW:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

1. Use Spring Punch to mark the holes. As shown in Fig. 1.
2. Pre-drill bracket holes with a 3/16" [4.5mm] drill bit.
As shown in Fig. 2.
3. Remove the bolt from the Angle Bracket Assembly.
Fig. 1
Step 3:
Install Angle Brackets
1. Attach Angle Bracket Base piece to the posts with supplied
T-25 thread-cutting screws. Use two screws per bracket.
Use low speed setting on drill. The side of the base with
two holes should be facing downwards. As shown in Fig. 1.
2. Reassemble the Angle Brackets, but DO NOT install the
Angle Bracket Cap at this time. As shown in Fig. 2.
3. Once top and bottom brackets are installed, remeasure
bracket spacing to confirm dimensions used in Fig. 2 and 3
of step 1.
4. Remove all metal shavings from deck, post base cover,
post, and panel before bracket is screwed to post.
Tip:
• Use a Bit Extender for an easier drilling process.
Fig. 1
28
PURE VIEW: Al
HOME GLASS BALUSTER INSTALLATION
13
Fig. 2
1"
[25.5mm]
Pre-Drill
with a 3/16"
[4.5mm]
drill bit

Publicité

Table des Matières
loading

Table des Matières