Fortress Building Products PURE VIEW Instructions D'installation page 43

Masquer les pouces Voir aussi pour PURE VIEW:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Fig. 1
Step 5:
Attach Adjustable I-Support To Deck
1. Adjust then fasten I-Support to deck surface with the
supplied Phillips Head Wood Screw.
Tip:
• Pre-drill with a 1/16" [1.5mm] drill bit.
Fig. 1
OTP & PROUD POST: ROUND ATR INSTALLATION
Step 1:
Round ATR Spacers
1. Attach spacers using provided self-drilling screws with a
5/16" [8mm] Nut Driver. Two screws per spacer.
2. DO NOT remove backing of double sided tape until you are
ready to permanently attach the ATR.
Note:
• The Accent Top Rail Kit comes with 7 spacers in the 93.89"
[2385mm] kit, 6 spacers in the 69.89" [1775mm] kit and
14 spacers in the 190" [4826mm] kit.
PURE VIEW: Al
Fig. 2
HOME GLASS BALUSTER INSTALLATION
13
43

Publicité

Table des Matières
loading

Table des Matières