Fortress Building Products PURE VIEW Instructions D'installation page 14

Masquer les pouces Voir aussi pour PURE VIEW:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Fig. 1
*Pure View Standard Grommets come installed in pre-slotted rails.
Step 4:
Install Top Rail
1. Carefully slip Top Rail over the top of the Balusters into the
slots & top Bracket Cups.
2. Pre-drill Bracket Cup holes for screws using a 3/16"
[89.5mm] drill bit.
3. Secure rail to Bracket Cups at this time with provided T-25
Drive Thread-Cutting Screws. Use low speed setting on drill.
Fig. 1
Top Rail
Step 5:
Attach I-Support To Deck
1. Fasten I-Support to deck surface with the supplied Phillips
Head Wood Screw.
Tip:
• Pre-drill with a 1/16" [1.5mm] drill bit.
14
Baluster
Pre-Installed
Grommet*
Pre-slotted Bottom Rail
PURE VIEW: Al
HOME GLASS BALUSTER INSTALLATION
13

Publicité

Table des Matières
loading

Table des Matières