Fortress Building Products PURE VIEW Instructions D'installation page 44

Masquer les pouces Voir aussi pour PURE VIEW:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

• The spacers should be equally spaced along the length
of the rail, with no more then 14" [355.5mm]spacing
between them.
• The end spacers should be placed as close to the end
brackets as possible.
Fig. 1
Spacer Mounted Next
Step 2:
Cutting the Round ATR to length
1. Measure the distance from the inside edge of the 2 posts.
2. Use an Adjustable Angle Finder to measure the angle need-
ed to make the ATR flush with the post. As shown in Fig. 2.
3. Use angle found with Angel Finder to mark the cut lines on
the ATR, and cut the ATR to length, file the edges, and paint
using the same steps as used for cutting down a panel.
4. When test fitting the ATR, place it on top of the spacers.
Do not press the ATR down over the spacers. Removing the
ATR from the spacers can damage the ATR and spacers.
5. Make sure the inside of the ATR is clean before remove the
backing of all of the double-sided tape on the ATR spacers.
6. A Rubber Mallet might be needed to complete installation.
If using a Rubber Mallet, use a cloth to protect the ATR
from damage. The ATR snaps down around the ATR spacer.
7. If you are installing a OTP Line Post, see the next page
before permanently installing the ATR.
44
To Stair Bracket
PURE VIEW: Al
HOME GLASS BALUSTER INSTALLATION
13
Fig. 2
Double Sided
Tape

Publicité

Table des Matières
loading

Table des Matières