Ii- Drilling The Wall; Iii- Fitting - Eurocave INOA 25 Manuel D'installation

Masquer les pouces Voir aussi pour INOA 25:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4 - I
• Fitting: (see C diagrams)
The conditioner comes supplied with a metallic mounting frame which
simplifies the process of drilling air entry and exit holes.
It also has extendable ducting to be cut to length (75 cm each) in order to
install the conditioner whatever the thickness of the wall.
Finally, the conditioner is supplied with an aesthetic front panel and 4 grids
for an aesthetic appearance.

II- Drilling the wall

- Determine the location of the conditioner housing (inside or outside the cellar)
- Position the metallic mounting frame: (1)
• in relation to the ceiling if fitting the conditioner at a height (maintain a distance of 200
mm between the top of the frame and the ceiling),
• in relation to the floor for a low fitting (maintain a distance of 80 mm between the
bottom of the frame and the floor).
- Use the metallic frame to outline the position of the 2 drill holes (2).
- Drill the wall.The holes must be larger than the outline drawn – between 210 mm min. and
280 mm max.

III- Fitting

- Fold the ring's 4 supports inwards (1).
- Fit the 2 extendable ducts onto the rings of the metallic frame (2).
- Screw the securing rings onto the ducts (3).
- Position the metallic frame while passing the flexible ducts through the 2 holes drilled into the wall (4).
- Push back the 4 supports towards the outside of the ring (5).
(1)
(2)
- Screw the metallic frame onto the wall with 2 high screws and two low screws (not supplied).Use screws suitable for the wall material (6).
- We recommend that you put a bead of silicone between the plate and the wall to ensure effective sealing.
- Pull the 2 ducts (fixed to the metallic frame) through the other side of the wall (7).
- Stretch the ducts to the maximum in order to make them as smooth as possible (8).
- Cut the ducts flush with the wall using a Stanley knife for the material (9) and pliers for the metallic wiring (10).
(6)
(7)
5
NSTALLING THE CONDITIONER
(3)
(8)
Grid
Extendable
Aesthetic
ducting
front panel
Wall drill
holes
Metallic
mounting
frame
Conditioner housed outside the cellar
Diagram C
(1)
(4)
(5)
(9)
Extendable
ducting
Metallic
mounting
frame
Grid
Aesthetic
front panel
Wall drill
holes
Conditioner housed inside the cellar
Diagram C
(2)
(10)

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Inoa 30Inoa

Table des Matières