Dconnect Box 2 - Esybox Diver Connection; Dconnect Box 2 - Esybox Diver Association; Operation; Reading And Setting Parameters - DAB ESYBOX DIVER Instructions Pour L'installation Et La Maintenance

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 33
Indicator status
Off
No connection
Waiting to establish a
Blinking
connection
On
Connected
Wi-Fi connection button
Used to create a direct connection between DCONNECT BOX 2 and a smartphone or tablet.
Holding the button down for 5 seconds, the LEDs (1) and (4) start blinking and the DCONNECT BOX 2 goes into access point mode. When the
device is in this status, it exhibits its own Wi-Fi network called DCONNECTBOX2-XXXXX to which you can connect directly through a
smartphone or tablet.
5.1
DCONNECT BOX 2 – ESYBOX DIVER connection
The pump connects to the DCONNECT BOX 2 via the Power Line Communication protocol, referred to as PLC. Thanks to this communication
channel, the user can monitor the pump status and actively interact through the app.
In order to communicate, ESYBOX DIVER and DCONNECT BOX 2 must be associated with each other and this operation is already done in
the factory. Once powered, the two units connect in a few minutes. During the device search phase, the PLC led (1) will blink regularly and once
correctly connected the led will remain on with a steady light.
The quality of the PLC connection can be influenced by many factors:
-
Power mains topology
-
Reactive loads present on the line
-
Connection length
-
Cable cross section
If there are communication problems, reduce the distance (and therefore the length of the electrical connection) between the two devices.
The two devices must be connected to the same single-phase power supply and must have a common phase and neutral.
5.2
DCONNECT BOX 2 – ESYBOX DIVER association
As already described, the two units in the same package are already associated in the factory, so this procedure should be used only in case of
replacement of one of the 2 units.
1)
Disconnect ESYBOX DIVER from the mains and wait 1 min
2)
Eliminate any previous associations on DCONNECT BOX 2
3)
Put DCONNECT BOX 2 in the association phase
4)
Connect ESYBOX DIVER to the electricity mains within 20 sec.
5)
Check the PLC led status on DCONNECT BOX 2. When it remains on with a steady light, the association has been
successful.
6

OPERATION

Once the electropump is primed, the system starts regular operation according to the configured parameters: it starts automatically when the tap
is turned on, supplies water at the set pressure (SP), and keeps the pressure constant even when other taps are turned on. When the water
consumption ends, the pump stops automatically after the time T2 has elapsed.
7

READING AND SETTING PARAMETERS

Using the app you can check the operating status of the pump and change the settings. Below is the list of parameters.
7.1
Status
Displays the pump status.
7.2
VP: Pressure display
Pressure measured on the system.
7.3
VF: Flow display
Displays the instantaneous flow.
Meaning of indicators
PLC (1)
Propriet. wireless (2)
No connection
Waiting to establish a
connection
Connected
ENGLISH
Service centre (4)
No connection
-
Connected
Table 3
21
Wi Fi (5)
No connection
Waiting to establish a connection
Connected

Publicité

Table des Matières
loading

Table des Matières