When a single UPS cabinet is positioned vertically, the UPS stands must
be attached to the bottom of the cabinet tower:
Powerware
9125 Installation Guide for IBM Applications
®
NOTE The air vents should be at the top of the unit when positioned vertically.
Figure 4. Vertical Cabinet Setup
1. Place the UPS horizontally, so that the left end of the unit is
accessible.
2. Slide and position the UPS stands over the end of the unit so
that the weight of the UPS is evenly distributed (see Figure 5).
Secure the stands with the screws provided in the accessory kit.
Figure 5. Installing the UPS Stands
3. Carefully position the unit upright on the UPS stands (see
Figure 6).
Continue to the following section, "Installing the UPS."