Télécharger Imprimer la page

FS S5850-24S2Q-DC Guide De Démarrage Rapide page 5

Commutateurs de routage l2/l3 gér

Publicité

Les langues disponibles

Les langues disponibles

Installation Requirements
Before you begin the installation, make sure that you have the following:
Phillips screwdriver.
M6 Screws.
Standard-sized, 19" wide rack with a minimum of 1U height available.
Category 5e or higher RJ-45 Ethernet cables for connecting the network devices.
Site Environment:
Do not operate it in an area that exceeds an ambient temperature of 45ºC.
The installation site must be well ventilated. Ensure that there is adequate air ow around the
switch.
Be sure that the switch is level and stable to avoid any hazardous conditions.
Do not install the equipment in a dusty environment.
The installation site must be free from leaking or dripping water, heavy dew, and humidity.
Ensure rack and working platforms are well earthed.
C O N
Mounting the Switch
E T H
Desk Mounting
1. Attach four rubber pads to the bottom.
2. Place the chassis on a desk.
ID S Y S
S 5 8 5 0 - 2
4 S 2 Q
ID SY S
CO N
ET H
S 5 8 5 0 -2
4 S 2 Q
1
2
3
4
5

Publicité

loading