Pelgrim SLK640RVS Mode D'emploi page 40

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION
Mounting
EN 10
• Position the drilling template inside the left cupboard on the right
hand side with the arrow point towards the back on the cupboard.
• Drill the holes marked on the template.
• Repeat the procedure for the right hand cupboard
• If the sides of the cupboards are 16 mm thick, insert 4 spacers Z on
the sides of the hood.
• Fix the hood to the cupboard using four screws N.
Additional instructions for the montage
Box adjustement
The hood can be installed in cabinets with different depths,
the front of the box must always be in line with the cabinet.
For alignment adjust the back stops of the box. For box
adjustment, loosen screws 'M' and slide square plates 'G' as
necessary and tighten screws 'M'.

Publicité

Table des Matières
loading

Table des Matières