Télécharger Imprimer la page

Quick TUMBLER TB 512 Manuel De L'utilisateur page 13

Publicité

Les langues disponibles
  • FR

Les langues disponibles

BEFORE USING THE CAPSTAN READ THESE INSTRUCTIONS CAREFULLY.
IF IN DOUBT, CONTACT YOUR NEAREST "QUICK
WARNING: the Quick
Do not use the equipment for other purposes.
Quick
®
shall not be held responsible for damage to equipment and/or personal injury, caused by a faulty use of the
equipment.
The capstan is not designed for the loads that might occur in extreme weather conditions (storms).
Always deactivate the capstan when not in use.
For improved safety we recommend installing at least two anchor capstan controls in case one is accidentally
damaged.
We recommend the use of the Quick
The contactor unit or reversing contactor unit must be installed in a point protected from accidental water contact.
THE PACKAGE CONTAINS: capstan - reversing contactor unit - base gasket - handle - bolts and screws (for assembly) - drill
template - user's manual - conditions of warranty.
TOOLS REQUIRED FOR INSTALLATION: drill and drill bit: Ø 9 mm (23/64") - hollow mill: Ø 50 mm (1"31/32) ;
hexagonal wrenches: 10 mm and 13 mm.
"QUICK
®
"ACCESSORIES RECOMMENDED: anchoring RL control board (mod. 800) - Waterproof hand helds R/C (mod.
HRC1002) - Foot switch (mod. 900) - Hydraulic-magnetic circuit breaker - Radio control RRC (mod. R02, PO2, H02).
ASSEMBLY PROCEDURE:
below deck to perform the installation in the lower part. The thickness of deck must be such as to allow the capstan to be
securely placed in position.
max
5 mm
(3/16")
ASSEMBLY:
when the ideal position has been established, drill four holes using the drill-
ing template provided. Place the upper part in position and connect it to the bottom part.
Fit the shaft into the gearbox. Fix the capstan by screwing the nuts onto the fixing studs.
Connect the supply cables from the capstan to the reversing contactor unit.
WARNING: before wiring up, be sure the electrical cables are not live.
TUMBLER 500 - REV002A
®
capstans are designed to weigh engineered for capstan operation.
®
hydraulic-magnetic switch as the motor safety switch.
the following parts are to be checked before the holes are drilled. There must be no obstacles
INSTALLATION REQUIREMENTS:
the deck are as parallel as possible. If this is not the case, compensate the difference
appropriately (a lack of parallelism could result in a loss of motor power). The deck
thickness must be included among the figures listed in the table. In cases of other
thicknesses it is necessary to consult a Quick
®
" DEALER.
Ensure that the upper and lower surfaces of
90°
90°
90°
90°
INSTALLATION
®
retailer.
GB
13

Publicité

loading

Ce manuel est également adapté pour:

Tumbler tb 524