EdilKamin LAGUNA M 25 Installation, Utilisation Et Entretien page 86

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 92
COMPONENTS CHECK AND SCHEDULED MAINTENANCE
Each season you must call the Technical Support Centre authorised by EDILKAMIN (TSC) for the
necessary seasonal maintenance.
It consists of:
• Cleaning the stove internally and externally
• Accurate cleaning of the exchange piping
• Carefully cleaning and removing dirt from the combustion chamber
and the relative compartment
• Cleaning the motors, mechanically checking the ranges and fastenings
• Smoke channel cleaning (gasket replacement on the piping) and the smoke extractor fan cham-
ber
• Check expansion tank
• Check and clean circulator
• Check probes
• Clean, inspect and de-scale the ignition resistance chamber, replace if necessary
• Cleaning/checking the synoptic panel
• Visual inspection of the electrical cables, the connections and power supply cable
• Cleaning the pellet tank and checking the auger-gearmotor assembly ranges
• Check and replacement, if necessary, of the door seal
• Functional testing: auger loading, switch on, operation for 10 minutes and switch off
The cleaning, control and/or maintenance operations to carry out are summarised below:
Ash drawer and crucible (Fig. 1)
Lower drawer chamber (Fig. 2)
"T" shaped tube cleaning
Upper chamber (Fig. 3-4-5)
Smoke pipe
Accurate cleaning of internal
smoke circuit and smoke channel
Seal testing
Functional testing
Times can vary based on the fuel used
PLACING OUT OF SERVICE (END OF SEASON)
At the end of each season, you are advised to empty the fuel tank using the two windows remove
the two side panels.
You are advised to disconnect the appliance from the electrical power mains.
MAINTENANCE
USER
Every
Every
week
15 days
- 86
-
Technical Support
authorised by
EDILKAMIN (TSC)
Every
Every
2
month
months
Centre
Every
season

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Laguna m 33

Table des Matières