• Only outlet pipes must be used suitable for
the fuel used.
• Correct installation of the chimney flue al-
lows, in the event electrical energy
is cut, normal smoke flow outwards.
• Avoid creating completely horizontal sec-
tions.
• An extractor hood must not be in the prem-
ises where the boiler is installed.
• Direct discharge on the wall is not permit-
ted.
• Given the low temperatures of the smoke
when the boiler is fully operational, the dis-
charge channels must be created in suitable
material to resist combustion products and
their possible condensate.
• Install an inspection valve to enable drain-
age of any condensate
formed.
• Use a rain-proof and wind-proof terminal.
• You need to place one or more measure-
ment points for sealed and/or auto-locking
combustion analysis.
• You are advised to check emissions after
installation.
• Draft must be guaranteed of 12 Pa.
• It must not be installed in the same prem-
ises as other heating appliances.
INSTALLATION
Boiler joint
Inspection
door
Ventilation
grill
outwards
- 57
-
Terminal cone
Non-
combustible
insulation
Ventilation
channel
Outer wall
Condensate
collector
Condensate drain