BFT VISTA SW 260 SXL Instructions D'utilisation page 26

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 35
8) SPRING PRELOAD CHANGE (for VISTA SW 260 SXL only) Fig. 8
WARNING! - This operation must be performed with the utmost caution.
MAI allentare o smontare il braccio dell'anta prima di aver rimontato
la vite di vincolo molla.
- Re-align the red reference marks (if they are not aligned when the leaf is closed,
open the leaf until they match) Fig. 8.1;
- Re-tighten the screw, paying attention to ensure that it enters the crown gear,
fastening the spring again (when re-aligning the marks, the holes shall match)
Fig. 8.2;
- According to the arm type in use, repeat all the steps described above, being
aware that:
Each arm coupling tooth section corresponds to a 20° arm turn and to
a spring pre-load decrease (if in the opening direction) / increase (if in the
opposite direction) of about 0.8Nm. Fig. 8.3
9) SPRING RELOADING (for VISTA SW 260 SXL only)
WARNING! - This operation must be performed with the utmost caution.
Questa operazione dovrà essere eseguita esclusivamente se la molla
di richiusura dovesse scaricarsi a causa della mancata osservanza delle
procedure corrette di installazione.
The automation is supplied with a pre-loaded re-closure spring, with a pre-defi ned
values marked with a red indication aligned between the chain and the carpentry.
Should the spring load decrease due to the incorrect execution of the prescribed
procedures, to bring it back to the proper value you shall perform the following
steps:
1- Disconnect any already installed arms;
2- If the automation is already fastened to the wall, hold it secured and do not
remove it;
3- If the automation has not been fastened yet, fasten it to a bench;
4- Turn on the power supply to the automation;
5- Press the "+" button on the electrical board; the motor will start reloading the
spring. Load it until the red marks are aligned.
6- Should you need to reverse the operation as the red mark alignment point has
been exceeded, use the "-" button on the electrical board.
7- Once the marks are aligned, WITHOUT TURNING OFF THE POWER SUPPLY,
screw the spring fastening screw back into the relevant seat.
The automation is now ready to be restarted.
10) POWER SUPPLY CONNECTION Fig. 10
- Check that the rating data match the mains data.
- Install a two-pole switch with a distance between contacts of 3mm or more.
- Check that the system is equipped with an appropriate overcurrent protection
system.
- Make sure that there are no sharp edges which could damage the cable.
11) CONTROL BOARD Fig. 12
11.1 CONNECTIONS Fig. 12.1
WARNING - When performing the wiring and installation operations, refer
to the regulations in force and anyway to the good practice principles.
The conductors powered with safety extra low voltage (24V) must be physically
separated from the low voltage conductors, or they must be properly insulated
with an additional insulation at least 1mm thick.
Conductors must be secured by an additional fastener near the terminals, like
cable ties.
Terminal
Defi nition
Power supply
1-2
--
15Vdc - 12W Max (*)
3-8
NO
Auxiliary input 2
4-8
NO
Auxiliary input 1
5-6
NO
A/B auxiliary output
7-8
NC
Test Open
8-9
NC
Safe Open
26 -
VISTA SW 260 SXL / VISTA SW 260 MXL
INSTALLATION MANUAL
Description
Output for power supply to sensors
or other devices
Input contact whose functions can
be configured as specified in the
parameter table. (see paragraph 12)
Input contact whose functions can
be configured as specified in the
parameter table. (see paragraph 12)
Auxiliary output which can be
configured as specified in the
diagram:
g
Safety opening sensor test
Safety opening sensor contact. If
the safety sensor installed on the
opening leaf section is connected to
the electronic board, "Safe Open" detects
any obstacle during the opening stage,
promptly stopping the leaf motion. If
detection ceases, the leaf resumes its
opening motion, then it closes at normal
speed. If the sensor is engaged during
the closing stage, the system does not
react and the door keeps moving. If the
leaf opens close to a wall (for example in
a corridor), you need to specify a value
(% of the total stroke) to defi ne the area
in which the sensor does not detect
the wall as an obstacle. This value can
be changed by editing parameter 20
(See the paragraph "Display operating
parameter management").
Terminal
Defi nition
Power supply
10-11
--
15Vdc - 12W Max (*)
12-13
NC
Safe Close
13-14
NC
Test Close
15-16
NC
Key
Power supply
17-18
--
15Vdc - 12W Max (*)
19-20
NO
Start 2
20-21
NO
Start 1
22-23
--
Lock
24-27-29
NO
Selector connector
25-26-28
NO
Selectors connector
(*) Total available power to be split among all the supply outputs.
11.2 "DIP-SWITCH" OPERATING PARAMETER MANAGEMENT Fig. 13
Tick the setting you
DIP
Logic
OFF
1
Automation type
ON
OFF
2
Arm type
ON
OFF
LOW ENERGY (see
3
table)
ON
OFF
PUSH&GO (see
4
table)
ON
Description
Output for power supply to sensors
or other devices
Closing safety sensor contact. If the
safety sensor installed on the closing
leaf section is connected to the
electronic board, "Safe Close" detects
any obstacle during the closing stage,
promptly stopping and reversing
the leaf motion, fully opening it at
standard speed and then closing
it at normal speed. If the sensor is
engaged during the opening stage,
the system does not react and the
door keeps moving.
Closing safety sensor test.
Key control. Lock signal. You may
connect a closing device, like an
electronic key, a key selector, a
transponder, etc.
Se il segnale si apre, la centrale
comanda la completa chiusura delle
ante (a partire da qualsiasi posizione
si trovino). Until the signal closes
back, the door stays closed and no
external device is detected (includ-
ing the multi-logic selectors).
The signal must be short-circuited
with COM if there are no connect-
ed devices.
Output for power supply to sensors
or other devices
Opening signal. You may connect any
leaf opening control devices. When
this signal closes, the leaves open.
This signal is monitored in both 2
Radar and 1 Radar logic.
Opening signal. You may connect
any leaf opening control devices.
When this signal closes, the leaves
open. This signal is only monitored
in 2 Radar logic.
Electric lock power supply output -
12Vdc or 24Vdc Max 500mA.
WARNING! for its confi guration,
follow the provisions contained in
the relevant paragraph
Connection to base/advanced
selector.
Pre -arrangement for selectors
connection NOT AVAILABLE
Description
performed
Motor
Spring
Articulated
Slide
Normal
Low Energy
Disabled
Enabled
Default
OFF
OFF
OFF
OFF

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Vista sw 260 mxl

Table des Matières