Initial Operation With Turbelle Driver - Tunze Multicontroller 7095 Mode D'emploi

Masquer les pouces Voir aussi pour Multicontroller 7095:
Table des Matières

Publicité

Initial operation with Turbelle
Multicontroller 7095 has been designed for the
operation with Turbelle
(1). Elder drivers, such as 240.24, 7240.24 (P) or
7240.25, must not be connected.
Connections
Prior to dis/connecting the connecting cable to the
pump, always disconnect the power supply unit of
the Turbelle
®
from the mains (2).
One of the five-pole connecting cables 7092.30 is
used to connect Multicontroller 7095 up to the driver
7240.26 / 7240.27 of Turbelle
stream pump, which also supplies the power.
By means of the Y adapter 7092.34 (4), two pumps
per output can be connected, which means that up
to eight pumps can be operated.
®
driver
®
driver 7240.26 or 7240.27
®
electronic or Turbelle
Mise en service avec Driver Turbelle
Le Multicontroller 7095 est conçu pour une utilisation
avec Driver de pompe Turbelle
(1). Les anciens modèles 240.24, 7240.24(P) ou
7240.25 ne peuvent être raccordés.
Raccordements
Avant tout branchement / débranchement d'un câble
de liaison sur le Driver, débranchez l'alimentation
Turbelle
®
pour une commutation sans charge (2).
Le Multicontroller 7095 se raccorde par le câble de
liaison 5 broches 7092.30 sur un Driver 7240.26 /
7240.27 de Turbelle
®
il est ainsi alimenté en courant (3).
Y-Adapter 7092.34 (4) autorise l'utilisation de deux
pompes par sortie et jusqu'à huit pompes en tout.
®
®
7240.26 ou 7240.27
®
electronic ou Turbelle
®
stream,
19

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

7095

Table des Matières