SETTING REQUIRED FOR OPERATION:
- MASTER board: zone=128, master=ON
- SLAVE board: zone=128, master=OFF
WIRING REQUIRED FOR OPERATION:
- The MASTER and SLAVE control units are interconnected through the 4
wires (RX/TX) for the SCS1 interface boards;
- All the activation controls, as well as the remote controls must refer to the
MASTER board;
- All the photocells (checked or unchecked) must be connected to the MAS-
TER control panel;
- The safety edges (checked or unchecked) of the MASTER leaf must be
connected to the MASTER control unit;
- The safety edges (checked or unchecked) of the SLAVE leaf must be
connected to the SLAVE control unit.
12) SCRAPPING
Warning: This operation should only be carried out by qualified personnel.
Materials must be disposed of in conformity with the current regulations. In
case of scrapping, the automation devices do not entail any particular risks
or danger. In case of materials to be recycled, these should be sorted out
by type (electrical components, copper, aluminium, plastic etc.).
13) DISMANTLING
Warning: This operation should only be carried out by qualified per-
sonnel.
When the control unit is disassembled to be reassembled on another site,
proceed as follows:
•
Disconnect the power supply and the entire electrical installation.
•
In the case where some of the components cannot be removed or are
damaged, they must be replaced.
The descriptions and illustrations contained in the present manual are
not binding. The Company reserves the right to make any alterations
deemed appropriate for the technical, manufacturing and commercial
improvement of the product, while leaving the essential product fea-
tures unchanged, at any time and without undertaking to update the
present publication.
INSTALLATION MANUAL
ENGLISH
17
LEO-D-MA - Ver. 06 -