Duct Covers Assembly & Installation (Optional) - Thermador PROFESSIONAL Série Manuel D'installation

Masquer les pouces Voir aussi pour PROFESSIONAL Série:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

11. Remove junction box channel covering the wires.
12. Remove circular knockouts behind junction box
channel.
13. Before hanging hood, install transition per Figure 10 or
Figure 11. Fasten transition with (2) 3/8" sheet metal
screws (supplied) and aluminum tape per all applicable
codes.
Note:
Screws must not hinder damper operation.
14. Using two people to lift, rest the hood on the screws in
the wood bracket. Use the keyholes labeled "F" in
Figure 13. Make sure the wood bracket fits into the
recess on the back of the hood.
F
Figure 13: Location of Screw Keyholes
15. Tighten the screws in keyholes. Check hood levelness
and adjust if necessary.
16. From inside the hood, drive 5/8" (16 mm) screws
through holes in hood into wooden bracket. See holes
labeled "J" in Figure 13.
17. Connect additional ducting.
English 10
Remove
2 screws
Figure 12: Junction Box Channel
J
Duct Covers Assembly &
Installation
Optional duct covers shown in Figure 14 may be used to fill
the space between the hood and ceiling in wall mount
installations. 6" (152 mm) and 12" (305 mm) high duct
covers are available and may be ordered separately (see
page 4)
Screw quantity
dependent on
hood size.
Figure 14: Attachment of Duct Cover(s) to Hood
1. If multiple duct covers are used, connect the pieces
together using sheet metal screws provided with the
duct cover accessories.
2. Attach the duct cover(s) to the hood using sheet metal
screws as shown in Figure 14.
3. From inside of hood, insert 5/8" (16 mm) screws
F
supplied through the holes indicated on each side and
along the front, into bottom of the cover.
(optional)

Publicité

Table des Matières
loading

Table des Matières