PRINCIPLE OF OPERATION
Assembly:
6101| S-LS-2:
8
9
1
2
3
8
6
9
5
1
2
3
BEFORE FIRST USE
Upon receipt of the goods, check the packaging for integrity and open it. If the packaging is damaged, please contact your
transport company and distributor within 3 days, and document the damages as detailed as possible. Do not turn the package
upside down! When transporting the package, please ensure that it is kept horizontal and stable. Please keep all packaging
materials (cardboard, plastic tapes and styrofoam), so that in case of a problem, the device can be sent back to the service
centre in accurate condition.
Disposing of packaging
The various items used for packaging (cardboard, plastic straps, polyurethane foam) should be conserved, so that the device
can be sent back to the service center in best conditions in case of problem!
7
6
1.
on/off switch of the SMD rework station
5
2.
SMD rework gun cable
3.
soldering iron connection socket
4.
on / off switch of the soldering station
4
5.
function button
6.
buttons for the temperature setting
7.
soldering iron temperature display
8.
SMD rework gun temperature display
9.
airflow volume adjustment knob
7
1.
on / off switch of the SMD rework station
2.
SMD rework gun cable
3.
soldering iron connection socket
4
4.
on / off switch of the soldering station
5.
soldering iron temperature setting knob
6.
soldering iron heater indicator
7.
SMD rework gun temperature display
8.
buttons for the temperature setting
9.
airflow volume adjustment knob
EN
DE
11