87
Schematic example of an installation of the type B11 valid for the Model FLAME 9
In models FLAME 9 must install the device break draft (equipped with wind) between the nozzle of the exhaust
fumes and the vertical pipe whose diameter is 180 mm.
The output of the device break draw at least 500 mm of vertical metal tube (diameter 180 mm).
The vertical section of pipe can be reduced to installation requirements, it is important not to use 90 ° bends
right after the break draft device.
Schematic example of an installation of the type B11 FLAME valid for Models FLAME 4, FLAME 6 and
FLAME 9.
To install B21, enslaved under the hood, you do not need any vertical section of pipe is not required and the
device used to break draft oven FLAME 9. Ovens FLAME4 and FLAME 6 have already been integrated into the
device break draft tailpipe and must not be removed.