Mounting Instructions - Hella Luminator Xenon Instructions De Montage

Masquer les pouces Voir aussi pour Luminator Xenon:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 12
10
English
GB
Tools you need:

Mounting instructions:

Electrical
Fig. page 2-3
!
• Folding rule
• Allen key = 3 mm, 6 mm
• Open-jawed spanner = 17 mm
For upright installation only.
Headlights must not vibrate,
must not project over the
bonnet, and must be installed
symmetrically.
Mark fastening point for
the headlight base on stable
ground drill holes.
Assembly steps: Seal holes
drilled with rust inhibitor!
Switch off the ignition.
Install relay in a splash water
protected place with the
terminals facing downward.
Only use the special wiring
harness supplied to establish
electrical connections.
Follow circuit diagram
A
, to
have the auxiliary headlights
switched on together with the
main beam.
Install the ballasts in a suitable
• Electric drill with 3,5, 4, 6,
11 and 12 mm drill bits
• Combination pliers
Tightly screw the headlight
base to the supporting surface.
Installation dimensions
place. In relation to this, pay
attention to the distance between
headlight and ballast, as this
connecting cable cannot be
extended.
Follow circuit diagram
B
, to
have the auxiliary headlights
switched on in addition to the
main beam via a separate switch.
Check the lighting system, adjust
the headlights, tighten the screws
and securely install the supply
cables.
• Side cutting pliers
max.
4 m
If you extend the wiring harness,
then ensure a sufficiently large
cross-section of the cables.
The lengths of the cables
between ballast and battery
must not exceed the following:
in 12 V systems:
2
9 m for 2.5 mm
and
2
5.5 m for 1.5 mm
in 24 V systems:
2
18 m for 2.5 mm
and
2
11 m for 1.5 mm
.

Publicité

Table des Matières
loading

Table des Matières