Nordpeis anama EU Low Manuel D'installation page 3

Table des Matières

Publicité

The result is that small cracks may appear in the
concrete/masonry.
Use the ireplace for a few months. If cracks appear,
scrape them out with a screwdriver or similar (to provide
more space for acrylic joint iller). Vacuum the surfaces
to remove any dust.
Inject acrylic joint iller and even it out with a spatula or
a inger wetted with soapy water.
The joint can be painted after a couple of days
Painting
When the ireplace has been illed/sanded and the
glued joints are dry, the ireplace is ready to be painted.
Use only breathable paint (acrylic) intended for
masonry.
Marble/granite
Clean the plates with mild soapy water and remove any
residue of spilled glue.
Never use acid/abrasive materials, as this will damage
the surface and polishing.
It is important to use detergent/sealant that is approved
for marble for cleaning and sealing.
Scratches in dark marble can be coloured with a pencil.
A professional stone centre can help you with diferent
products for surface treatment of the stone
For your own safety, comply with the assembly
instructions. All safety distances are minimum distances.
Installation of the insert must comply with the rules and
regulations of the country where installed. Nordpeis AS
is not responsible for wrongly assembled inserts.
We accept no liability for typographical errors and
changes.
NB! See separate instructions for the insert
Attention! The airlow behind Panama is a
prerequisite for cooling down a combustible wall.
The air gap must not under any circumstances be
covered as this may cause a ire.
Panama EU - Straight / Corner
Insert
Q-34AL (R/L) / Q-23 FL
Steel chimney
Can be connected to steel chimney.
Weight including insert
Panama EU Standard
with integrated irewall / Q-23 FL
Panama EU Standard
with integrated irewall / Q-34AL (R/L)
Panama EU Low / Q-23 FL
Panama EU Low / Q-34 AL (R/L)
Weight - extra elements
Panama EU extension
Panama EU front bench set
Panama EU woodshelf
Panama EU woodshelf high
Floorplate
Please follow the rules and regulations regarding
loorplates in your country.
Minimum measurements irewall
Panama has an integrated irewall and can be
mounted directly against a combustible wall. Make sure
to follow the rules regarding insulation of the smoke
pipe in your contry.
Safety Distances (FIG 2)
Ensure that the safetdistances are complied with.
Please note that these safety distances can vary from
country to country.
Illustration (FIG 1A/1B Panama=mm)
*The illustration indicates the approximate centre height
of the hole for the lue. Consider possible inclination of
the lue prior to perforating the chimney. Distortions in
loors and walls may inluence the height. Dry stack
the ireplace for accurate height and positioning of
the lue/chimney connection. If a fresh air supply set
(accessory) is connected through the loor, prepare the
bottom element before assembly.
Fresh air supply (accessory)
ATTENTION! The product can only be connected to
the fresh air supply through the pre cut areas in the
surround (See FIG Panama =AIR). Seal of the gap
between the fresh air hose and the concrete with a
non combustible sealant, Rockwool etc
For more information see separate assembly
instructions for fresh air supply.
Assembly instructions FIG 3-20
GB
400 kg
409 kg
380 kg
389 kg
70 kg
140 kg
200 kg
220 kg
3

Publicité

Table des Matières
loading

Table des Matières