Mounting The Handle And Operatingknob; Preparing The Connection To The Flue - Dovre 300CB Installation Et Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3. Mount the ash drawer under the bottom plate
below the door using the M8x12 screws
4. Set the appliance upright on the mounted legs.
Support the appliance when placing it upright
so that not all the weight is not on the legs.
Mounting the handle and
operating
knob
Secure the handle using the M6x20 screw supplied(2)
to the front piece and the operating knob for the air
regulator (1); see following figure.
Preparing the connection to
the flue
When connecting the appliance to the chimney you
have the choice of connecting via either the side, the
rear or the upper side. See the paragraph 'Connecting
to the side, upper side or rear'. It is also possible to
make a connection using the 400-200 attachment that
can be ordered separately; see the paragraph 'Con-
necting using attachments'.
The appliance is not supplied with a flue gas ope-
ning.
Sealant and materials supplied.
Subject to change because of technical improvements
Connecting to the side, upper side
or the rear
First of all, choose whether to connect the appliance
to the flue from the the side, upper side or the rear.
1. Mount the sealing collar (300-8) on the flue ope-
ning with the two screws and M8 nuts; see fol-
lowing figure.
2. Apply sufficient sealant to the seal (300-7).
3. Close off the other connection options with the
sealing covers and clamping plates supplied using
M6 screws.
4. Use enough sealant
1
2
09-20020-166
Connecting using attachments
The 400 and 200 attachments increase the heat
exchange area of the stove thereby making it more effi-
cient. By using the optional attachments (sold sepa-
rately), you can make side and upper connections.
1. Remove the covers on the upper side of the stove.
2. Place the attachment onto the opening.
3. Use the supplied stove sealant for sealing the
attachment and the appliance.
4. Follow the instructions given in the paragraph 'Con-
necting to the side, upper side or rear' section to
create the flue opening and to mount the collar con-
nection supplied.
09-20020-167
7

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

340cb342cb

Table des Matières