Installation Procedure - Toto ZN TBP01301U Manuel D'installation Et D'utilisation

Robinetterie de baignoire autoportante
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION PROCEDURE

Cutting the Plaster Guard
1. Cut the plaster guard at a height of
3/8"(10)
3/8" (10) from the finished floor surface
8mm
and remove the plug, the bolt and the
blocking lid from the tub filler base.
(a) If the finished floor exceeds the max
line, the escutcheon of the spout body,
etc. cannot be mounted properly, there-
fore, make arrangements beforehand
about the floor finishing.
Mounting the Faucet Main Body
2. In order to prevent reversed piping,
pay attention to the direction of the
spout main body when mounting the
spout main body onto the tub filler base.
3. Adjust the direction of the spout in relation to the
bathtub and secure the spout main body using the
provided bolts. Confirm that the spout main body is
vertical. Check the spout main body for looseness
and make sure that water does not pass through
the product or leak from the connections when the
handle is closed.
8mm
4

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Gr tbg02306uZl tbp02303u

Table des Matières