Toto ZN TBP01301U Manuel D'installation Et D'utilisation page 5

Robinetterie de baignoire autoportante
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION PROCEDURE
Caulking
4. Apply silicone caulk to water-
proof the clearance between the
plaster guard and the floor, and
lower the plaster guard down to
the finished floor surface.
Mounting the hand shower
and hose
5. Make sure that the gasket
is mounted adequately, then
mount the shower hose and the
hand shower. This completes
product installation.
Testing the water supply connec-
tions.
6.Turn on the water supply and
confirm that water comes out
from the spout and shower. Check
around the hose connections and
clearances for any water leakage.
5

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Gr tbg02306uZl tbp02303u

Table des Matières