Start Up And Configuration - Toshiba ESTIA HWS-802XWHM3-E Manuel D'installation

Masquer les pouces Voir aussi pour ESTIA HWS-802XWHM3-E:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Hydro Unit
8

START UP AND CONFIGURATION

Set the DIP switches and function codes.
Setting DIP Switches on the Board in the Hydro Unit
• Detach the front cover and the electric parts box cover of the Hydro Unit.
• Set the DIP switches on the main board.
▼ Fig. 8-01
SW10
3
External P2 pump operation
SW11
1
Internal backup heater operation
2
Hot water cylinder heater operation Operate
3
Booster heater operation
SW12
1
Hot water supply operation
2
Zone 1 operation
3
Zone 2 operation
SW13
1
Type of motorized 3-way valve
2
Interlocking with boiler
3
Auto restart for power failure
4
SW02
4
Room thermostat
31-EN
SW10
ON
ON
ON
2
3
4
1
1
OFF
Description
Continuous operation
Description
Operate
Operate
Description
Valid
Valid
Invalid
Description
• 2-wire spring return type
• 3-wire SPST type
Invalid
Auto restart
Description
Invalid
SW11
SW12
ON
2
3
4
2
3
4
1
Switch mode
Default setting
Switch mode
Default setting
Switch mode
Default setting
Switch mode
Default setting
Default setting
– 32 –
Installation Manual
SW13
ON
2
3
4
1
Interlocked with the
OFF
ON
internal pump
synchronized with P1.
OFF
ON
Not operate
OFF
ON
Not operate
OFF
ON
Not operate
OFF
ON
Invalid
OFF
ON
Invalid
OFF
ON
Valid
OFF
ON
3-wire SPDT type
OFF
ON
Valid
OFF
ON
Manual restart
OFF
ON
Valid

Publicité

Chapitres

Table des Matières
loading

Table des Matières