Start up and configuration

Set the DIP switches and function codes.
 Setting DIP switches on the board in the Hydro Unit
• Detach the front cover and the electrical control box cover of the Hydro Unit.
• Set the DIP switches on the main board.
▼ Fig. 9-01
SW No.
DIP No.
Boiler install location
1
OFF = Heating side after 3 way valve
ON = Before 3 way valve
2
Not Used
Used to when an external cylinder thermostat is
connected
02
3
OFF = No external cylinder thermostat;
ON = External tank thermostat connected
Used to when an external room thermostat is
connected
4
OFF = No external room thermostat;
ON = External room thermostat connected
P1 Pump operation for hot water
1
OFF = synchronised with heat pump
ON = Normally run
P1 Pump operation for heating
2
OFF = Normally run
ON = Stopped at the outside temperature over 20 °C
10
Synchronisation of Pump P2.
OFF = P1 synchronised with pump P1
3
ON = P2 continuous operation (pump off when
remote controller switched off)
Pump P1 power of regular, When long-term thermo-
off.
4
OFF = None operation
ON = regular power
Used to activate Hydro Unit back up heaters.
1
OFF = Back up heaters activated;
ON = back up heaters de-activated
Used to activate hot water cylinder electrical heater.
2
OFF = hot water cylinder heater activated;
11
ON = hot water cylinder heater de-activated
Used to activate external booster heater output.
3
OFF = external booster heater output activated;
ON = external booster heater output de-activated
4
Not Used
SW10
SW11
ON
ON
ON
2
3
4
2
1
1
OFF
Description
SW12
ON
ON
3
4
2
3
4
1
After
Default
Commissioning
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
– 32 –
Installation Manual
SW13
2
3
4
1
Change 1 Change 2 Change 3
EN
32-EN