Water Quality; Piping Insulation - Toshiba ESTIA HWS-802XWHM3-E Manuel D'installation

Masquer les pouces Voir aussi pour ESTIA HWS-802XWHM3-E:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Hydro Unit
Water charging
Charge water until the pressure gauge shows 0.2 MPa (2 bar).
Hydraulic pressure may drop when the trial run begins. In that case, add water.
Air may enter if the charged hydraulic pressure is low.
Loosen the purge valve cap by two turns to release air.
▼ Fig. 7-18
Loosen the air vent screw of the pump, pull out air in the pump, and tighten again.
Loosen the cap of the pressure relief valve to release air.
Water may come out of the pressure relief valve.
Release the air completely from the water circuit. Failure to do so may disable correct operation.

Water quality

The water used must satisfy EN directive 98/83 EC.

Piping insulation

It is recommended that insulation treatment be applied to all pipes. To perform optional cooling operation, apply
insulation treatment of 20 t or more to all pipes.
19-EN
Loosen 2 turns for
proper venting
– 20 –
Installation Manual

Hide quick links:

Publicité

Chapitres

Table des Matières
loading

Table des Matières