Installation Requirements - FS S1900-5TP Guide De Démarrage Rapide

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Back Panel

Installation Requirements

Before you begin the installation, make sure that you
have the following:
Desktop mounting: ESD bracelet (or ESD gloves)
Wall mounting: ESD bracelet (or ESD gloves), ladder, marker,
hammer drill, rubber hammer, screwdriver
Site Environment:
Do not operate it in an area that exceeds an ambient
temperature of 40°C.
The installation site must be well ventilated. Ensure that there is
adequate air flow around the switch.
Be sure that the switch is level and stable to avoid any
hazardous conditions.
Do not install the equipment in a dusty environment.
The installation site must be free from leaking or dripping
water, heavy dew, and humidity.
Ensure wall and working platforms are well earthed.
4
EN
5
4
3
Uplink
2
1
Power Supply

Publicité

Table des Matières
loading

Table des Matières