Back Panel; Installation Requirements - FS S1900-8TP Guide De Démarrage Rapide

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Back Panel

Power Supply

Installation Requirements

Before you begin the installation, make sure that you have the following:
Desktop mounting: ESD bracelet (or ESD gloves)
Rack mounting: ESD bracelet (or ESD gloves), Phillips screwdriver, M6 Screws, Standard-sized 19"
wide rack with a minimum of 1U height available
Site Environment:
Do not operate it in an area that exceeds an ambient temperature of 45°C.
The installation site must be well ventilated. Ensure that there is adequate air ow around the
switch.
Be sure that the switch is level and stable to avoid any hazardous conditions.
Do not install the equipment in a dusty environment.
The installation site must be free from leaking or dripping water, heavy dew, and humidity.
Ensure rack and working platforms are well earthed.
Grounding Point
100-240V AC
50 / 60HZ
Fan Port
S1 90 0- 8T P
Po E+
PW R
1
2
3
Le ft LE D:
Li nk /A ct M
od e Ri gh
t LE D: Po E
M od e
3

Publicité

Table des Matières
loading

Table des Matières