Checklist - SKYLOTEC D-BOLT Instructions D'utilisation

Masquer les pouces Voir aussi pour D-BOLT:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 56
Enter building sketch on page 2 and checklist on page 2
Roof plan (please draw lines with a ruler):
(If there is insufficient space, please use separate sheets and attach them to the protocols!)

Checklist:

Substrate as expected (no doubts concerning load-bearing capacity)
Verification of load-bearing capacity present
installation executed in accordance with the installation instructions of the
manufacturer
Connection technology assembled as specified by the respective
manufacturer
Only corrosion-protected fastening elements were used
All fastenings photographed with number plate
installation plan stored on site
Identification sign/s is/are present and affixed
Pre-tension is correct (only rope system)
System/attachment point is free of contamination and runner moves easily
Runner was transferred to the owner (only for rail/cable system
Trial walkthrough was executed and passed
(Only for rail/cable system)
System is assembled free of defects and has been transferred
installation instructions, use instructions are present, complete, and
have been transferred to the owner
Additional information
Remarks by chief assembler:
Handed out to:
(Owner or owner's representative)
Construction site manager installation company
City:
MAT-MA-0005-EN_D-BOLT
Name in block letters
Name in block letters
Date:
09/06/2017
Example:
yes
no
N.R.
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
Signature
Signature
Page 16 of 18