5.2 Installation instructions for Skylotec D-Bolt AP-058; AP-063-GE and
AP-063-GPS anchor point using Würth injection system W-VIZ-IG/A4 M16x120.
Pay attention to fixing installation instructions and approval (ETA-04/0095).
1
Using a hammer drill, create a bore hole with a drill nominal diameter of do=22 mm and
bore hole depth of h1 ≥ 120 mm vertically to the surface of the anchor base.
2
Clean the bore hole (blow out 2x oilfree, brush out 2x, blow out 2x oilfree).
3
Attach the mixer to the cartridge using the dispenser gun.
4
Before use, dispense a strand of around 10 cm but do not inject it into the bore hole.
Checking the temperature of the anchor base: The temperature must be ≥ +5°C. Starting
5
from the base of the bore hole, fill the hole with injection adhesive. About 2/3 of the bore
hole has to be filled with injection adhesive.
Push in the anchor with internal thread with a slight turning movement down to the bore
6
hole base.
Visually check the amount of adhesive or setting depth marking respectively. The adhesive
has to reach the surface. If no adhesive is visible at the surface, the anchor with internal
7
thread must be removed immediately and WIT-VM 100 injection adhesive injected again.
Comply with the curing time of the injection adhesive.
8
Remove excess adhesive and protective cap.
9
Install AP-063-GE or AP-063-GPS, do not exceed max. torque of 50Nm
MAT-MA-0005-EN_D-BOLT
09/06/2017
Page 8 of 18