Italiana Camini IDROPOLIS Installation, Usage Et Maintenance page 41

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 54
fi g. 1
B
C
fi g. 3
E
fi g. 5
A
fi g. 7
ASSEMBLY
A
fi g. 2
D
fi g. 4
F
P
F
F
fi g. 6
Fig. 1
This illustration shows how the stove will appear once it has
been unpacked.
The pieces indicated below are packaged separately.
• 1 ceramic lower front panel (E - Fig. 5)
• 6 ceramic side panels (F - Fig. 6)
• 4 aluminium profi les (P - Fig. 6)"
Per il montaggio procedere come segue:
Fig. 2
Remove the cast-iron top (A), with the grid and pellet hopper
cover after screwing off the 4 fi xing screws.
Fig. 3
Remove the right-hand front profi le (B) from its housing. Apply
the 15x5 gasket to the ceramic front panel support (C).
Fig. 4
Unscrew one of the two lower centering plates (D).
Fig. 5
"Insert the ceramic lower front panel (E) into its housing.
Reassemble the lower centering plate and right-hand front profi -
le removed previously."
Fig. 6
Insert the ceramic side panels (F) into the relative guides.
Insert an aluminium profi le (P) between the ceramic side pa-
nels.
Fig. 7
Replace the cast iron top (A - Fig. 2) removed previously.
N.B.
In the event of vibration, an 8x1 adhesive gasket is provided to
place between the profi les and ceramic side panels.
- 41
-

Publicité

Table des Matières
loading

Table des Matières