TEMPUR-PEDIC UP 2.0 Manuel Du Propriétaire page 9

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

installation guide
STEP 7
Uncoil the remote from the frame and extend from base. Ensure
remote is securely plugged in.
STEP 8
Carefully flip the base over on to its legs. Important: Two people
are required to move the bed base. Do not drag across the floor.
Do not rest frame on its side, excessive pressure may damage
the legs.
STEP 9
Plug the Power Cord into a power source.
A surge protector is recommended.
STEP 10
Quickly test remote functions to verify proper setup before
placing mattress on base. Return the base to a FLAT position
before placing the mattress on top.
For customer support, call Customer Service: 1-800-887-4321
STEP 11
Slide the left side of the Mattress Retainer Bar into the
bracket. Pull the retainer bar to the opposite bracket and
secure the right side.
Setup is now complete!
Test all functions on remote.
7

Publicité

Table des Matières
loading

Table des Matières