Install the analyzer and controller:
• In a clean, dry, well ventilated, temperature controlled location with
minimum vibration that does not receive direct exposure to sunlight.
Install the analyzer so that:
• It is upright and level.
• There is sufficient clearance around it to make plumbing and electrical
connections.
• There is sufficient clearance around it to remove the two end covers.
• The power cord and power button are visible and easily accessible.
• There is no air flow restriction through the air filters.
• The air filters do not get wet.
• It is as near the sample source as possible to decrease analysis
delay.
Mechanical installation
C80 controller mounting
Install the controller in a flat, stable, vertical panel. Make sure that the
top surface of the controller is level. Cut an opening in the panel at eye
level. Refer to
Figure 6
for dimensions and mounting.
10 English
Figure 6 C80 controller mounting
Analyzer mounting (A1000 S10 and A1000XP-S models)
Attach the analyzer to a flat, stable, vertical surface. Refer to the
illustrated steps in
Figure
8. Make sure that the top surface of the
analyzer is level.
Mounting hardware is supplied by the user. Refer to
minimum clearances.
Figure 7
for the