• Tubing, ½-inch OD (10 ft)
• Tubing, 1-inch OD (10 ft)
• Cable assembly, 1-m probe extension
• Clamp, hose worm drive
• CL17 analyzer kit (if applicable)—Refer to
Figure 3 Reagents for WDMP sc startup kit
1 CL17 analyzer reagents (if applicable)
2 pH buffer solutions—pH 4, 7 and 10
3 20 NTU Stablcal standard solution
CL17 analyzer kit
Refer to the list that follows for the items in the CL17 analyzer kit.
• Pinch plate and thumb screws (2x)
• Stir bar, micro
• Filter, 40 mesh SST
• Funnel
• Tubing harness (3x)
• Tube, 11/16-inch OD x 1/2-inch ID, 1.025 ft
Section 3 Installation
Multiple hazards. Only qualified personnel must conduct the tasks described in this section of the
document.
3.1 Mechanical installation
Personal injury hazard. Make sure that the wall mounting is able to hold 4 times the weight of the
equipment.
CL17 analyzer kit
on page 9.
4 Conductivity standard solution
5 19.2 N H
SO
2
6 20 NTU Stablcal standard solution, sealed vial with
RFID tag
• Tubing, 0.193-inch OD, 2.333 ft
• Fitting, barb (5x)
• Fitting, elbow
• Hose clamp
• Seal, quad ring
D A N G E R
W A R N I N G
for CL17 (if applicable)
4
English 9