Disposal Instruction; Side-By-Side Installation; Mechanical Dimensions - GE AF-60 LP Guide Rapide

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

1.1.7 Disposal Instruction

1.1.8 Before Commencing Repair Work
1.
Disconnect AF-60 LP
Micro Drive from mains (and external DC supply, if present.)
2.
Wait for 4 minutes (M1, M2 and M3) and 15 minutes (M4 and M5) for discharge of the DC-link.
3.
Disconnect DC bus terminals and brake terminals (if present)
4.
Remove motor cable

1.1.9 Side-by-Side Installation

The frequency converter can be mounted side-by-side for IP 20 rating units and requires 100 mm clearance above and below for cooling. Please refer to the
specifications near the end of this document for details on environmental ratings of the frequency converter.

1.1.10 Mechanical Dimensions

A template for drilling can be found on the flap of the packaging.
Illustration 1.1: Mechanical dimensions.
Power (kW)
Unit
1 X 200-240 V 3 X 200 -240 V 3 X 380-480 V
Size
M1
0.18 - 0.75
0.25 - 0.75
M2
1.5
1.5
M3
2.2
2.2 -3.7
M4
M5
1)
For Keypad with potentiometer, please add 7.6 mm.
Table 1.1: Mechanical Dimensions
Equipment containing electrical components must not be disposed of together with domestic waste.
It must be separately collected with electrical and electronic waste according to local and currently valid legisla-
tion.
Height (mm)
A
A (incl. decoupling plate)
0.37 - 0.75
150
1.5 - 2.2
176
3.0 - 7.5
239
11.0-15.0
292
18.5-22.0
335
DEH-41264A
Width (mm)
a
B
205
140.4
70
230
166.4
75
294
226
90
347.5
272.4
125
387.5
315
165
140
AF-60 LP
Micro Drive
(mm) Max. Weight
Depth
1)
b
C
Kg
55
148
1.1
59
168
1.6
69
194
3.0
97
241
6.0
248
9.5
1
3

Publicité

Table des Matières
loading

Table des Matières