C16A
► If using C16/EPU or C16/ZOU44A, fix the bottom
thrust pieces using the eccentric discs.
► Place the hose clamp, included with the load cell,
around the bottom thrust piece for the subsequent
sealing of the sealing sleeve.
► Insert the load cell into the bottom thrust piece with a
rotating movement so that the dowel pin on the thrust
piece engages in the recess of the rotation stop.
► Carefully lower the platform weighing machine back
down. Then insert the upper load application elements
of the load cell in to the loading point of the top thrust
piece so that the load cells are just not under load and
can still be aligned vertically.
Important
The load cells must be aligned vertically, otherwise
restoring cannot work correctly and generate incorrect
measurements.
To do this, adjust the bottom thrust piece with the
eccentric discs loosened. You can most easily check
the vertical installation position of the load cell by
positioning a suitable prism spirit level on the
cylindrical enclosure pipe.
► Lower the platform and then perform the same steps
on the other face.
► After installation is complete, check the vertical
installation position of all load cells with the platform
floating freely. If corrections are necessary, perform
them after raising the platform again.
A1460-4.0 HBM: public
Mechanical installation
17