C16A
► Knock the dowel pin with a hammer into the blind hole
of the thrust piece until the pin is seated. Position the
open side of the dowel pin radially (Fig. 6.1).
Fig. 6.1
Position of dowel pin relative to rotation stop
The correct seat of the pin is ensured by the depth of the
hole.
The footprint or foundation under the bottom thrust piece
(load transfer) and above the top thrust piece must be as
smooth and level as possible. The thrust pieces can be
positioned or screwed directly onto concrete, if the sur
face quality is appropriate, so that no further panels need
to be provided.
► Produce the necessary holes required for fastening or
attachment to the platform and foundation before as
sembly. The dimensions, depending on the thrust
piece, can be found in the dimension drawings in
Chapter 11, Page 33.
6.3
Assembly sequence
Mechanical assembly will be described below using a
platform weighing machine as an example. We recom
mend carrying out assembly in this sequence.
A1460-4.0 HBM: public
Mechanical installation
or
15