Mechanical installation
Grease these points
16
► Raise one face of the platform weighing machine,
which is already aligned centrally, using suitable lifting
equipment.
► Mount the prepared load application parts with the
rotation stop with dowel pin facing downwards and the
one without a dowel pin facing upwards, see Chapter
6.2.
► Orientate the bottom thrust piece so that the dowel
pin faces in the direction that the cable output and
type plate should also face. Do not as yet
permanently fix the bottom thrust piece in place.
► To protect against wear, contamination and corrosion,
generously grease the upper and lower load
application elements in the loading point and the
dowel pin and rotation stop on the load cell using the
supplied grease (Fig. 6.2).
Fig. 6.2
Points to be greased
A1460-4.0 HBM: public
C16A